CNE High-end Data Transfer Unit Data Transmission Unit Cabinet DTU Cabinet for Power Distribution Systems
The CNE High-end Data Transfer Unit (DTU) Cabinet is a professional-grade solution designed specifically for power distribution systems. This robust cabinet houses advanced data transmission equipment that enables seamless communication and real-time monitoring across power networks. Built with premium materials and superior engineering, the cabinet provides optimal protection against environmental factors while ensuring reliable performance of the DTU components. Its thoughtful design includes proper ventilation, cable management systems, and easy access points for maintenance. Perfect for utilities and industrial applications, this cabinet supports various communication protocols and can be customized to meet specific power distribution requirements. The unit's durable construction and weather-resistant features make it ideal for both indoor and outdoor installations, ensuring continuous data transfer operations in any environment. Whether for smart grid applications or traditional power networks, this DTU cabinet delivers exceptional reliability and functionality.
- Overview
- Recommended Products




Product Name |
Data Transfer Unit |
Rated Voltage |
220/380/660V |
Electric Current |
5A-20A |
Application |
Industrial;Indoor |
Number of Sockets |
Customization |
Size |
Customization |
Materials |
Metal;STAINLESS STEEL |
Brand Name |
CHINENG |







Q1:Are you a manufacturer or a trading company?
A:We are a professional manufacturer of bus duct, cable trays, and switchgear.
Q2:What is your payment term?
A:Our usual payment is 50%TT in advance ,50%TTbefore shipment (the bill of landing).Other payment methods can also be negotiated.
Q3:How long is the warranty period of your products?
A:Our products usually come with a two-year warranty. If you are concerned about the product quality, we support sample orders.
Q4:How long is the production time of the product?
A:In the case of less than 100 meters, the production will be completed within 15 days after receiving the advance payment. For the remaining situations, it will be determined through negotiation.
